Understanding the F4(S) Form: A Guide to Quality Assurance for Existing Combined Heat & Power Schemes in the UK
The F4(S) form is an official self-assessment tool designed by the Department for Business, Energy & Industrial Strategy (BEIS) to evaluate the quality of certain existing Combined Heat & Power (CHP) schemes. This form is part of the UK’s broader efforts to promote efficient energy use and environmental sustainability through the CHPQA (Combined Heat & Power Quality Assurance) programme.
What is the Purpose of the F4(S) Form?
The primary aim of the F4(S) form is to enable operators of small-scale CHP schemes—specifically reciprocating engine-based systems under 2 megawatts electrical capacity (MWe)—to perform a self-assessment of their scheme’s energy efficiency and quality. This process helps determine whether the scheme meets the criteria for certification under the CHPQA standards, which can influence eligibility for government incentives and support schemes.
Who Should Use the F4(S) Form?
This simplified self-assessment form is applicable only to specific CHP schemes that meet certain criteria:
- Reciprocating engine-based schemes with a capacity below 2MWe.
- Use of a single conventional fuel source, such as natural gas or diesel.
- Inclusion of only one engine and associated heat recovery equipment within the scheme boundary.
- Exclusion of heat-only boilers.
If a scheme does not meet these criteria, or if it involves multiple engines or heat-only boilers, the full version of the F4 form must be submitted for proper assessment.
Key Components of the Form
Part 1: Scheme Identification and Declaration
This section requires the operator to provide details about the site, the scheme, and to declare their responsibility for accurate submission. It includes:
- Site name and reference.
- Company and scheme references, which are provided by the programme administrator.
- A formal declaration confirming the accuracy of the information supplied and responsibility for ongoing updates.
Part 2: Energy Inputs and Outputs
This section involves recording the scheme’s operational data over a specified period, including:
- The period of operation (hours per year).
- Total fuel input measured in megawatt-hours (MWh), based on gross calorific value.
- Power output generated, also in MWh, measured at the generator terminals.
- Useful heat outputs, which are critical for assessing the scheme’s efficiency and environmental impact.
Part 3 & 4: Efficiency and Quality Index Calculation
The form guides operators through the calculation of power efficiency and the quality index, which are essential for determining scheme certification. These calculations should be precise, with figures rounded to two decimal places, and are based on guidance notes provided by the CHPQA programme.
Submission and Compliance
Operators must resubmit the F4(S) form annually—specifically in January—to maintain their certification status. The form must be accompanied by supporting data from the scheme’s monitoring systems, and all calculations should adhere to the latest CHPQA standards and guidance notes.
Fill in your form directly online
No printing: type your details into the boxes of the official form, tick, then download the PDF ready to send.
- 1Type into the form boxes
- 2Tick in one click
- 3Save and download the PDF
Data Confidentiality and Use
Information provided in the form is stored securely and used solely for the purposes of the CHPQA programme, including statistical analysis and policy development. The department also maintains a publicly accessible database of CHP schemes to support transparency and regulatory oversight.
Points of Attention for Applicants
- Ensure all data is accurate and up-to-date, particularly the scheme’s operational hours and energy inputs/outputs.
- Use the latest guidance notes and CHPQA standards to complete calculations correctly.
- Submit the form on time—by the end of January each year—to avoid delays in certification and potential eligibility issues for government incentives.
- Keep a copy of the completed form and supporting documentation for your records and future audits.
In conclusion, the F4(S) form is a vital tool for operators of small-scale CHP schemes to demonstrate their scheme’s efficiency and compliance with UK standards. Proper completion and timely submission support the broader goals of energy efficiency, environmental protection, and sustainable development in the UK’s energy landscape.