Skip to content

Quality assurance for combined heat and power self assessment of proposed new CHP sch

Home › Library › Environment & energy › Quality assurance for combined heat and power self assessment of proposed new CHP sch

Personal information:

Understanding the F3(S) Form: Self-Assessment for New Combined Heat & Power Schemes in the UK

The F3(S) form is an official document issued by the Department for Energy Security and Net Zero, designed specifically for the self-assessment of proposed new Reciprocating Engine-based Combined Heat & Power (CHP) schemes. This form plays a crucial role in the UK’s efforts to promote high-quality, efficient energy generation on smaller scales, particularly for schemes with a capacity below 2 megawatts electrical (MWe). If you are planning to develop a new CHP project within these parameters, understanding how to complete and submit this form is essential for compliance and eligibility for government schemes.

Who Should Use the F3(S) Form?

The F3(S) form is intended for applicants proposing new CHP schemes that meet specific criteria:

  • The scheme will be less than 2 MWe in electrical capacity.
  • It will use a single conventional fuel, such as natural gas or diesel.
  • The scheme includes only one engine and associated heat recovery equipment, excluding heat-only boilers.
  • It complies with the Power and QI Threshold Criteria for Good Quality CHP based on design data.

It is important to note that if your project involves multiple schemes on the same site that are interconnected through a common heat header, or if it exceeds the specified capacity, a different, full version of the form (F3) should be used. The F3(S) is tailored for smaller, standalone schemes, providing a simplified self-assessment process.

When and How to Complete the Form

The F3(S) form must be filled out based on the final design and anticipated operating conditions of the CHP scheme. It is a snapshot of your proposal, reflecting the scheme’s specifications at the point of project planning before installation. The form covers several key sections:

  1. Scheme Identification & Site Information: Details such as site name, company, scheme reference, sector, and existing CHP schemes (if any).
  2. Scheme Description: Information about the equipment, including manufacturer, model, engine type, and capacity.
  3. Monitoring Arrangements: Details of metering stations for inputs and outputs, including the main gas meter’s MPR (Meter Point Reference) number.
  4. Energy Inputs & Outputs: Estimated fuel input, power output, and useful heat output for the first year of operation.

Applicants must attach a detailed energy flow diagram illustrating the scheme’s operation, which helps in demonstrating compliance with efficiency and quality standards.

Points of Attention and Submission Guidance

Completing the F3(S) form accurately is vital to ensure your scheme qualifies for the UK’s CHP quality assurance and related government incentives. Some important points include:

Online editing included

Fill in your form directly online

No printing: type your details into the boxes of the official form, tick, then download the PDF ready to send.

  1. 1Type into the form boxes
  2. 2Tick in one click
  3. 3Save and download the PDF
Get started for £0.79
  • Use the latest version of the guidance notes and standards available on the official government website.
  • Provide precise data on fuel types, capacities, and energy demands, using the gross calorific value for fuel calculations.
  • Ensure all metering equipment is correctly specified, with MPR numbers and serial details, to facilitate proper monitoring and verification.
  • Submit the completed form to the designated CHPQA Programme administrator at the address provided, prior to installation or commissioning.

Remember that the information provided will be stored securely and used solely for the purposes of the CHPQA programme, including statistical analysis and scheme administration.

Conclusion

The F3(S) form is a vital step in establishing a compliant and high-quality CHP scheme in the UK. It allows project developers to self-assess their proposals against national standards, ensuring their schemes meet the criteria for government recognition and support. Proper completion and timely submission of this form can facilitate smoother project development, eligibility for incentives, and contribution to the UK’s energy efficiency and decarbonisation targets.

Frequently asked questions

What is the purpose of the F3(S) form?

The F3(S) form is used for self-assessment of proposed new Reciprocating Engine-based CHP schemes in the UK, ensuring they meet quality and efficiency standards.

Who should complete the F3(S) form?

Developers and operators of new CHP schemes with capacities below 2 MW should complete the form for compliance and approval purposes.

How does the F3(S) form support UK energy goals?

It promotes high-quality, efficient energy generation on smaller scales, contributing to the UK's energy security and net zero objectives.

What information is required in the F3(S) form?

Details about the proposed CHP scheme, including technical specifications, expected efficiency, and environmental impact assessments.

Similar documents