Skip to content

CHP scheme description (Form F2(S))

Home › Library › Environment & energy › CHP scheme description (Form F2(S))

Personal information:

Understanding the Official Form F2(S) – CHP Scheme Description for the UK Department for Business

The Form F2(S) is an official document used within the United Kingdom’s regulatory framework to certify and describe small-scale Combined Heat and Power (CHP) schemes, specifically those involving reciprocating engines. Managed by the Department for Business, Energy & Industrial Strategy, this form plays a vital role in the quality assurance process for CHP installations that are less than 2 megawatts electric (MWe) in capacity.

Purpose and Application of the Form

This form is designed for applicants operating a single CHP scheme on a site, where the total on-site capacity does not exceed 2MWe. It is particularly relevant for schemes that:

  • Use a single conventional fuel, such as natural gas or diesel;
  • Include only one engine within the scheme boundary, excluding heat-only boilers;
  • Are not connected through a common heat header with other schemes, which would require a different form.

The purpose of the form is to provide detailed information about the scheme's technical specifications, capacity, and monitoring arrangements. This data supports the certification process, which can influence eligibility for government schemes such as the Renewable Heat Incentive or Contracts for Difference.

When and How to Use Form F2(S)

The form should be completed when applying for CHPQA certification for an existing scheme. It must be resubmitted only if there are significant changes or additions to the scheme. Applicants are advised to consult the latest guidance notes and standard documents available on the official government website, ensuring all information aligns with current requirements.

Key Sections of the Form

1. Scheme Identification

This section captures essential details such as the site name, reference number, and company information. The site reference is allocated by the Programme Administrator after processing a related Form F1.

2. Economic Sector

Applicants specify the sector that best describes their site—such as public administration, healthcare, or manufacturing—using a predefined list to facilitate statistical analysis.

3. Scheme Description

Details about the scheme’s existing status, fuel billing period, and energy flow diagrams are provided here. Applicants must include a diagram illustrating the energy flow within the scheme, which helps verify the scheme's configuration and operation.

4. Equipment and Capacity Details

This section requires a comprehensive list of the prime mover(s)—the engine(s)—including manufacturer, model, commissioning year, and output capacities in heat and electricity. The total electrical capacity (kWe) is summed from individual engines to determine the scheme’s overall power output.

5. Monitoring Arrangements

Applicants list all metering points, including gas and electricity meters, with details such as serial numbers, installation years, and measurement ranges. Proper metering is crucial for accurate performance assessment and compliance with certification standards.

6. Capacity Specifications

The scheme’s maximum heat and power capacities are recorded based on manufacturer data. These figures are essential for assessing whether the scheme falls within the scope of the simplified form and for ensuring accurate performance evaluation.

Online editing included

Fill in your form directly online

No printing: type your details into the boxes of the official form, tick, then download the PDF ready to send.

  1. 1Type into the form boxes
  2. 2Tick in one click
  3. 3Save and download the PDF
Get started for £0.79

Declaration and Submission

The applicant, acting as the nominated Responsible Person, must sign and date the declaration affirming the accuracy of the information provided. The completed form is then submitted to the CHPQA programme administrator at the designated address.

Points of Attention and Recommendations

Applicants should ensure that all technical data, such as energy flow diagrams and capacity figures, are accurate and correspond with installed equipment. It is also advisable to review the latest guidance notes (e.g., GN2(S), GN12) to ensure compliance with current standards. Any material changes to the scheme’s configuration or operation should be promptly reported, as they may impact certification status.

Overall, Form F2(S) serves as a critical document in validating small-scale CHP schemes, supporting both regulatory compliance and the pursuit of government incentives aimed at promoting energy efficiency and sustainability within the UK.

Frequently asked questions

What is the purpose of Form F2(S)?

Form F2(S) certifies and describes small-scale CHP schemes involving reciprocating engines, ensuring compliance and quality assurance within the UK regulatory framework.

Who manages the Form F2(S)?

The form is managed by the Department for Business, Energy & Industrial Strategy in the United Kingdom.

Which CHP installations require Form F2(S)?

Small-scale CHP schemes involving reciprocating engines that fall below specific capacity thresholds require this form for certification and regulatory compliance.

How does Form F2(S) contribute to CHP quality assurance?

It provides official documentation certifying the scheme's specifications and compliance, supporting quality assurance and regulatory oversight.

Similar documents